301-2 Kinsey Street / Raleigh, NC / 27603 / PH (919) 754 - 8452
A Storied Span: The Boylan Bridge
January 22 through March 4, 2006
Opening Reception:
Sunday, January 22 from 2-5 p.m.
Gallery Talk:
Saturday, March 4 at 4 p.m.
In 1982, the bridge connecting Boylan Heights to Hillsborough Street was demolished after much controversy. It was eventually replaced by the current Boylan Bridge. Jen Coon visually explores the events surrounding this architectural landmark using printmaking techniques.